Material Requirements Planning (MRP)
system. A key part of the role is integrating the MRP system with
Power BI
to provide real-time insights and reporting. Replace manual, spreadsheet-based workflows with automated systems, making operations more efficient, accurate, and data-driven. Work closely with different departments, including manufacturing, engineering, and IT, to ensure the integration of the new MRP system and reporting tools are seamless and effective. What skills and experience would you need? Expertise in Power BI, EAP, QAD, and MRP systems (essential). Experience with the software development lifecycle and structured methodologies. A minimum of 3 years experience working with software and system integration. Excellent communication skills and ability to work with a team. Applicants must have an existing right to work in the UK and evidence of eligibility will be required. Suitable candidates will be contacted.
#J-18808-Ljbffr