The Eastern Green Link 2 (EGL2) project is a 5-year initiative that involves the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. This will be the longest HVDC cable in the UK and the UK's single largest transmission project, providing enough power for 2 million UK homes. The project is a joint venture with Hitachi Energy (HEBA).
#J-18808-Ljbffr
At BAM, we imagine, create and enrich buildings and infrastructure across the UK & Ireland. Our vision is to build a sustainable tomorrow. We think beyond the build and focus on the bigger impact. It’s how we make the iconic buildings and infrastructure that shape our society. And that’s why we’re on a mission to make possible. Connected communities, new habitats and brighter futures. These are just some of the things we’re making possible, wherever we go. At the top of our list is always making a positive impact possible - to create a more sustainable tomorrow, for everyone.